|
|
|
|
|
|
|
|
Main Goals:
Explanation and necessities of programs: 2006
This does not include the public and private power stations which are not synchronized with the national network. The forecasted growth for this industry during the next five years is 7 to 10 percent per year. Regarding the transmission and distribution equipments, the investment cost is estimated to be about 60 billion dollars (based on the international pricing at the end of the scheduled five years period). In addition, the operation cost (with a load factor of 2/3 ) would amount to 40 billion dollars, based on the international prices of fuels, and other costs of operation, repair, and maintenance. Moreover, the power system management and control have been restructured during the last decade to improve the efficiency and reliability of the systems. Remarkable international scientific and research activities are dedicated to reform and change the previous classical methods for management and control of restructured power systems. For developing countries it is necessary to centralize the scientific efforts and also the facilities to avoid the loss of investment through conflict of interests in development of restructured power systems.
|
|
CEPSMC © 2006 | All Rights Reserved | Designed By Iman Nasseri |